Detach and reset
Palos Hills Solar Panel Removal and Reinstallation
Your array taken down for the reroof, kept safe, put back and measured, with an update at each stage.
What Happens to Your Array, Stage by Stage
Stage one: a baseline. Before anything is unplugged, Solar Panel Removal Palos Hills photographs the array, the mounts and the wire runs, and logs what the system is producing. That number matters later. Stage two: shutdown. Power to the array is cut and every circuit isolated in the proper sequence so no one is handling live circuits. Stage three: removal. The array is taken apart and lowered: modules, rails, conduit. Each module gets a tag matching its position, and the whole lot is counted. Stage four: storage. Everything is stacked and protected from impact, moisture and theft for as long as the reroof takes. A call goes out to you once the roof is bare. Stage five: new attachments. Once the roofer finishes, fresh mounts go into the new roof and every penetration is re-flashed. Stage six: reinstall and reconnect. Modules return to their tagged spots and the wiring is restored. Stage seven: proof. Output is measured and compared with the baseline, monitoring is reconnected, and you receive the numbers along with photos and the inventory. Seven stages, and you hear about every one of them.
Line Items in Every Detach and Reset
Each of these is on the quote. None of them appears later as a surprise.
Baseline reading
System output recorded before shutdown, plus photos of the layout and wiring.
De-energize and disconnect
Power taken down in the right order before the first module is lifted.
Module, rail and conduit removal
The full array cleared from the roof surface.
Tagging and count
Every module marked to its position and every piece counted.
Protected storage
Stacked and kept safe from knocks, weather and theft for the length of the reroof.
New mounts, new flashing
Fresh attachments in the new roof, each penetration re-flashed.
Reinstall and rewire
Modules returned to their tagged positions and the system reconnected.
Output versus baseline
Production measured, compared and shared with you, with monitoring back online.
The Job in Three Phases
Price and calendar
Roof visit, baseline reading and a firm figure by phone, typically inside 48 hours. Dates are set against your roofer's tear-off.
Off and stored
Shutdown, removal, tagging and storage, done before the roofing crew starts. You get a call when the deck is clear.
Back and measured
Fresh attachments, flashing, reinstall and reconnection, then an output comparison you can see for yourself.
What You Can Count On
Updates without asking
Each milestone triggers a call. You never have to wonder whether the panels are still in storage.
A number to compare
The before and after output readings are yours, so working means measured, not assumed.
Fixed lines on the quote
Each task priced on its own, agreed before work begins.
- Baseline recorded
- Every module tagged
- Re-flashed attachments
- Output compared
Roofer Lined Up? Get the Solar Side Priced
Module count and tear-off week are all we need to start. The firm figure and the calendar follow.